Lime Slurry Soil Stabilization-Target Distribution Center, Phoenix, Arizona

Asphalt Busters completed one of the largest lime slurry projects in Arizona on time and as bid. The 100 acre site required over 250 truck loads of lime that was slaked (mixed with water) producing over 8,100 tons of hydrated lime slurry. Because of the massive amount of lime needed and the critical production requirements, silos were setup to accept lime deliveries 24 hours a day and 7 days a week.
Mixing lime slurry
Computer controlled truckRemixing lime slurry
















Application of lime slurryOn-site storage and mixing